Download Assembly and operating instructions Sprinkler measuring orifice
Transcript
Sprinkler measuring orifice SMB Assembly and operating instructions Sprinkler measuring orifice SMB/SMB-OE A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 2 SMB 1. 1.1 General.....................................................................................................................................................................................3 Exclusion of liability..............................................................................................................................................................3 2. 2.1 2.2 2.3 2.4 2.5 2.6 Safety ........................................................................................................................................................................................4 General safety information .............................................................................................................................................4 Proper use..............................................................................................................................................................................4 Explanation of pictographs and signs ........................................................................................................................4 Safety information for the owner and the operators .........................................................................................5 Regulations and guidelines .............................................................................................................................................5 VdS approval..........................................................................................................................................................................5 3. Transport and storage .....................................................................................................................................................5 4. 4.1 4.2 4.3 4.4 Description .............................................................................................................................................................................6 Field of application...............................................................................................................................................................7 Design and function............................................................................................................................................................7 Peculiarity SMB-OE .............................................................................................................................................................7 Installation variants ............................................................................................................................................................8 5. 5.1 5.2 5.3 5.4 Installation...............................................................................................................................................................................9 Preparation for installation.............................................................................................................................................9 Installation of the orifice ring .........................................................................................................................................9 Installation of the dial gauge....................................................................................................................................... 10 Minimess hose connection......................................................................................................................................... 12 6. 6.1 6.2 Commissioning ................................................................................................................................................................. 13 Zero-point adjustment................................................................................................................................................... 13 Initial startup...................................................................................................................................................................... 14 7. Maintenance...................................................................................................................................................................... 15 8. Service.................................................................................................................................................................................. 15 9. Disposal................................................................................................................................................................................ 15 10. 10.1 10.2 10.3 10.4 10.5 10.6 Technical data................................................................................................................................................................... 16 General technical data.................................................................................................................................................. 16 Materials ............................................................................................................................................................................. 16 Measuring range............................................................................................................................................................. 17 Inlet and outlet paths..................................................................................................................................................... 18 Dimensions......................................................................................................................................................................... 19 Installation kits .................................................................................................................................................................. 20 11. Spare parts ........................................................................................................................................................................ 21 A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 3 SMB 1. General These assembly and operating instructions apply to sprinkler measuring orifices, type SMB with a display of m 3 /min and to the SMB-OE with percentage display. All information contained in these operating instructions on assembly, operation, repairs and maintenance have to be observed and adhered to. The operating instructions form an integral part of the sprinkler measuring orifice; they have to be kept at a suitable location in the vicinity of the place of application and must be accessible for the operators. In case of interaction of different plant components, the operating instructions of those also have to be observed. 1.1 Exclusion of liability Kirchner und Tochter will not accept any liability for damage or disruptions caused by operating errors, non-observance of these assembly and operating instructions, inexpert execution of assembly and repair work or by the improper use of the sprinkler measuring orifice. A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 4 SMB 2. 2.1 Safety General safety information These assembly and operating instructions contain important information to be observed on the assembly, the operation, on repairs and maintenance of the sprinkler measuring orifice. Each person charged with the assembly, the operation, repairs and maintenance must have read and understood these operation instructions. Non-observance of these assembly and operating instructions, or inexpertly conducted assembly and repair work may result in disruptions of the sprinkler system. As a consequence, man or animal may be at risk or material assets may be damaged. Hazards by electric energy or released media energy must be prevented. 2.2 Proper use The VdS approval of the sprinkler measuring orifice is valid for the flow measurement of water. Installation in pipework may be effected only between two flanges (intermediate flange assembly). Select the sprinkler measuring orifice model in accordance with the pipe crosssection at the location of application for the sprinkler measuring orifice. The limit values of the sprinkler measuring orifice are to be observed as prescribed in chapter „Technical data“. Rebuilding or other modifications of the measuring device may be effected by Kirchner und Tochter only. 2.3 Explanation of pictographs and signs Pictograph on work safety This pictograph can be found at all hints on work safety in these assembly and operating instructions pointing out hazards for life and limb of persons. Further, this pictograph highlights safety hints in these operating instructions that point to regulations, guidelines or operating sequences that must be observed without fail. Non-observance may result in damages to or a destruction of the measuring orifice and/or other parts of the installation. A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 5 SMB 2.4 Safety information for the owner and the operators The personnel charged with the assembly, the operation, repairs and maintenance must be qualified to fulfill the respective tasks and must have been trained and instructed with regards to the task in question. 2.5 Regulations and guidelines Apart from the information contained in these assembly and operating instructions, the regulations, guidelines and standards such as DIN EN, as well as the DVGW and VdS guidelines in case of branch-oriented applications must be observed; the same is true for the regulations on the prevention of accidents valid in the destination country. 2.6 VdS approval The sprinkler measuring orifice has been approved by the VdS. During the installation, operation, repairs and maintenance, the VdS guidelines have to be adhered to. 3. Transport and storage At the factory, the sprinkler measuring orifice was suitably packed for transport and storage. Transport and storage should be effected while in the original packing only. The measuring device is to be protected against shocks and blows! A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 6 SMB 4. Description Pic. 1 1. scaling 2. hand 3. dial gauge 4. pipe work 5. orifice 6. flange A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 7 SMB 4.1 Field of application The sprinkler measuring orifice SMB is a measuring device employed to measure the flow rate in pipework of stationary sprinkler systems. 4.2 Design and function Due to physical reasons, different pressure potentials are found on both sides of the orifice (5). This differential pressure acts quadratic proportional to the volume flow inside the pipework (4). The scaling (1) of the dial gauge (3) is realized in volume flow units (m 3 /min). The dial gauge displays the present volume flow inside the pipe via the position of the hand (2). 4.3 Peculiarity SMB-OE All information contained in these assembly and operating instructions are also valid for the measuring device SMB-OE. A peculiarity of the sprinkler measuring orifice SMB-OE is the fact that the scaling of the scale reading plate has been subdivided in percent. A label on the dial gauge serves to read the effective flow values in m 3 /min for the individual nominal cross-section of the pipe. (refer to chapter 10.3) This permits the combination of the dial gauge with all nominal cross-sections of the SMB-OE. A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 8 SMB 4.4 Installation variants Installation direction of flow from left to right from right to left from bottom to top from top to bottom Pic. 2 Thanks to the special articulated design, the dial gauge of the sprinkler measuring orifice pivots by 180 degrees in both directions. Therefore, an assembly in various installation positions is possible (refer to picture 2). A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 9 SMB 5. Installation Installation may be effected by trained personnel only! Pic. 3 5.1 5.2 Preparation for installation 1. Verify the local conditions and the direction of flow inside the pipework at the place of installation of the sprinkler measuring orifice. 2. Make sure that the sprinkler measuring orifice is suitable for installation at the planned location with regards to nominal cross-section, min. inlet and outlet distance, maximum working pressure and medium (also refer to chapter 10). 3. Shut off and secure the pipework in accordance with regulations and empty the circuit. 4. Lay out the installation kit for the delivered measuring orifice (refer to chapter 10.6). Installation of the orifice ring For an intermediate flange installation of the sprinkler measuring orifice, two flanges PN 16 have to be installed in accordance with DIN EN 1092-1 and the VdS guidelines. The flange distance required for installation is 40 mm with an additional 2 mm each for both flange seals. A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 10 SMB 1. Pre-assemble the flanged connection in such a way as to permit the insertion of the measuring orifice with its seals from the front (vertical piping) or from above (horizontal piping), respectively. 2. Together with the seals attached on both sides, place the measuring orifice between both prepared flanges and slide same all the way against the preassembled screws. This serves to center orifice and seal. The seals have to be in true alignment with the entire circumference of the measuring orifice. The flow direction has to coincide with the hand on the measuring orifice. 3. Insert the remaining screws and uniformly tighten all screwed connections crosswise. Note The best measuring accuracy is obtained with smooth inside pipe joints and pipe configurations in accordance with the VdS guidelines. 5.3 Installation of the dial gauge Pic. 4 Remove the shipping protection plugs (1, Pic. 4) from the threads of the dial gauge and the screwed connections of the measuring orifice. A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 11 SMB Pic. 5 The sealing rings (9) required during assembly have been attached to the dial gauge with cable binders. 1. Use screws (4 and 7) to fix the dial gauge with its inserted sealing rings (9) to the ball valves of the measuring orifice. In the process, connect the plus line of the dial gauge with the plus line of the measuring orifice and minus line of the dial gauge with the minus line of the measuring orifice. Observe the respective markings at the dial gauge and on the lable of measuring orifice. 2. Position the dial gauge in such a way, as to permit an unimpeded reading of the display. 3. Tighten the fixing screws (4 to 7) with a torque of 15 Nm. In order to prevent leaks, the joining pieces (1 and 2) should not be tightened with a torque. When tightening the screwed connections (4 and 7) immobilize the joining pieces (1 and 2) with a wrench. 4. Next follow the steps in chapter 6 „Commissioning“. A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 12 SMB 5.4 Minimess hose connection Scope of delivery a) e) b) c) d) c) e) f) g) With assembly of the Minimess hose connection the hinge threading needs not to be applied. The Minimess hose connection is delivered already partly assembled. To the Minimess scope of delivery belong: a) indicator part with fastening brackets for wall mounting. b) ¼“ i/a double threaded nipple c) ¼“ a threaded fitting d) hose connection (l = 1500 mm) e) sealing ring f) strainer g) ¼“ a/a detachable double threaded nipple Pic. 5a Assembly The hose end with the strainer will be mounted at the orifice side. The hose end without strainer will be mounted at the indicator part. The indicator part (with fastening brackets for wall mounting) can be installed by the customer in a location that is vibration-free. As a rule, these are concrete buttresses. Before start-up, vent the hose lines up to a point directly in front of the indicator part. Notes on operation: To ensure serviceability of hoses and so as not to shorten their useful life by exposing them to additional stresses, be aware of the following: When in use, hose lines should never be subjected to tensile, torsional or compressive stresses. Avoid damage through external mechanical, thermal or chemical influence. Do not paint over hose lines. A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 13 SMB 6. Commissioning 6.1 Zero-point adjustment zero point not Ok zero point Ok Adjust zero point concentric to the rest position (RP) Pic. 6 In case the hand of the dial gauge is not within the range of the rest position marked RP with the flow cut off, the sprinkler measuring orifice has to be readjusted as follows: 1. Detach the screws (Pic 7, 3) from the dial gauge 2. Remove the translucent cover lid 3. With the zero-point adjustment screw (4) adjust the hand to the center of the rest postion (Pic. 6) 4. Put cover lid back on 5. Insert screws and tighten same A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 14 SMB 6.2 Initial startup Pic. 7 The correct installation is a prerequisite for commissioning. The following steps have to be followed for the initial startup: 1. Close ball valves (1 and 2) 2. Put conduit under pressure 3. Simultaneously open the ball valves (1 and 2) 4. Check tightness of all components of the sprinkler measuring orifice. A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 15 SMB 7. Maintenance The sprinkler measuring orifice is maintenance-free. In order to warrant a reliable operation and a long service life of the device, we recommend regular checks of the device, such as: check of the display remove deposits inside the nozzles of the banjo bolts check of the joints between orifice ring and dial gauge If Minimess hose connection is employed: check filter in strainer regularly. The exact checking cycles are determined by the VdS regulations and are to be adjusted depending on the operating and surrounding conditions. 8. Service All defective or faulty devices are to be returned directly to our repair shop. In order to process complaints of our customers as quickly as possible, kindly contact our Sales Department tel. no. +49 2065-96090 before returning any parts. 9. Disposal For a better environment: Please help us protect our environment by disposing of the parts used in accordance with the relevant legislation or by recycling same. A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 16 SMB 10. Technical data 10.1 General technical data VdS approval G 4990049 Measuring principle Differential pressure metering at orifice Scale in m 3 /min or % at SMB-OE max. working pressure 16 bar Installation intermediate flange installation in accordance with the VdS guidelines Measuring accuracy 2,5% at the approved full scale range value 5,0% at the approved measuring range start value The inter-values for the permitted measuring accuracy are the result by a linear interpolation. 10.2 Materials Orifice hard-coated aluminum Screwed connections nickel-plated brass, 1.4308 Ball valves nickel-plated brass Dial gauge Aluminum A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 17 SMB 10.3 Measuring range Measuring range SMB Model SMB 80 SMB 100 SMB 150 SMB 200 SMB 250 For pipes with inner diameter of [mm] /(DN) 83,1 / 80 107,9 / 100 160,3 / 150 210,1 / 200 263,0 / 250 Approved measuring range [m³/min] 0,6 – 2,1 1 – 3,4 2 – 7,25 4 – 12,35 4 – 18,12 Max. deviation from the full-scale range [m³/min] [%] ± 0,0525 ±2,5 ± 0,085 ±2,5 ± 0,18125 ±2,5 ± 0,30875 ±2,5 ± 0,453 ±2,5 Measuring range SMB-OE DN80 Indication % 100,00 90,00 80,00 70,00 60,00 50,00 40,00 30,00 28,57 DN200 Indication % 100,00 90,00 80,00 70,00 60,00 50,00 40,00 30,00 32,39 DN100 Indication DN150 Indication [m3/min] 2,10 1,89 1,68 1,47 1,26 1,05 0,84 0,63 0,60 % 100,00 90,00 80,00 70,00 60,00 50,00 40,00 30,00 29,41 [m3/min] 3,40 3,06 2,72 2,38 2,04 1,70 1,36 1,02 1,00 [m3/min] 12,35 11,12 9,88 8,65 7,41 6,18 4,94 3,71 4,00 DN250 Indication % 100,00 90,00 80,00 70,00 60,00 50,00 40,00 30,00 22,08 [m3/min] 18,12 16,31 14,50 12,68 10,87 9,06 7,25 5,44 4,00 % 100,00 90,00 80,00 70,00 60,00 50,00 40,00 30,00 27,59 [m3/min] 7,25 6,53 5,80 5,08 4,35 3,63 2,90 2,18 2,00 A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 18 SMB 10.4 Inlet and outlet paths Pic. 8 The optimum accuracy is obtained, if the pipe configuration conforms to the VdS guidelines. The following inlet and outlet sections that must not contain any valves, knees, elbows, changes in cross-section or similar, apply to the various SMB models. When using pumps creating fluctuations in the volume flow (possible with centrifugal pumps driven by a diesel engine), we recommend to extend the inlet region of steady flow from 10 d to 18 d. Should pulsation and vibration from pumps cause unsteady indicator readings, a separate Minimess hose connection (l = 1,500 mm) can be fitted to an indicator part that is designed for wall mounting, see Item 5.4. Model SMB SMB SMB SMB SMB 80 100 150 200 250 Min. inlet region of steady flow A [mm] 800 1000 1500 2000 2500 Min. outlet region of steady flow B [mm] 400 500 750 1000 1250 A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 19 SMB 10.5 Dimensions 96 104 E 40 B A Pic. 9 Model SMB SMB SMB SMB SMB 80 100 150 200 250 A [mm] 144 164 220 275 331 B [mm] 84,1 108,9 161,8 211,1 264,5 E [mm] 311 321 349 377 406 A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 20 SMB 10.6 Installation kits SMB Quantity installation kit 8 8 DN 80 8 2 DN 100 8 8 8 2 DN 150 8 8 8 2 DN 200 12 12 12 2 DN 250 12 12 12 2 Designator hexagon bolt DIN 931-M16x110-8.8 galvanized nut DIN 934-M16-8 washer DIN 125-17-A2 seals 1) Ø143,5x Ø86x2 hexagon bolt DIN 931-M16x110-8.8 galvanized nut DIN 934-M16-8 washer DIN 125-17-A2 seals 1) Ø163,5x Ø111x2 hexagon bolt DIN 931-M20x120-8.8 galvanized nut DIN 934-M16-8 washer DIN 125-17-A2 seals 1) Ø219,5xØ164x2 hexagon bolt DIN 931-M20x120-8.8 galvanized nut DIN 934-M20-8 washer DIN 125-21-A2 seals 1) Ø274,5xØ213x2 hexagon bolt DIN 931-M24x130-8.8 galvanized nut DIN 934-M24-8 washer DIN 125-25-A2 seals 1) ) Ø330,5xØ266x2 1) Use rubber seals or water-resistant seals. A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice 21 SMB 11. Spare parts 1 10 7 6 9 8 2 11 5 4 11 3 Pic. 10 Bill of parts Pos. Qty. 1 2 3 4 5 6 7 8 9 10 11 12 1 1 2 2 2 2 2 2 12 1 4 1 Designator Dial gauge Measuring orifice Joining piece Straight joint L-type joint Screw Double-threaded nipple Ball valve Sealing ring Clear-view cover Screw with damping insert Assembly and operating instructionsA) 1 orifice with joining pieces (Pos. 2, 3, 8, 9) B) 1 set pre-assembled fittings (Pos. 4, 5, 6, 9, 11) C) 1 dial gauge (Pos.1, 7, 10) D) 1 set of sealing rings (Pos 9) E) 2 strainers for Minimess hose connections Material Al hard-coated AI CuZn nickel-plated 1.4308 1.4308 CuZn nickel-plated CuZn nickel-plated CuZn nickel-plated Steel, phosphatised/NBR Acryl CuZn nickel-plated -- A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6 Sprinkler measuring orifice SMB The equipment from Kirchner und Tochter has been tested in compliance with applicable CE-regulations of the European Community. The respective declaration of conformity is available on request. Technical data supplied without liability. The current valid version of our documents can be found under this URL: www.kt-web.de The Kirchner und Tochter QM-System is certified in accordance with DIN-EN-ISO 9001:2008. The quality is systematically adapted to the continuously increasing demands. A. Kirchner & Tochter GmbH Dieselstraße 17 · D-47228 Duisburg Fon: +49 2065 9609-0 · Fax: +49 2065 9609-22 Internet: www.kt-web.de · e-mail: info@kt-web.de Version 2.6